A finishes a task in 5 h and B in 8 h; they work together for 2 h, then only B continues-how long in total? I added rates 1/5+1/8=13/40 so the first 2 h do 26/40 of the job, then I subtracted 2 from 8 and said 6 more hours, but I think that’s wrong-how should I handle the remaining work with B’s rate?
Welcome to Maths For Fun – where mathematical curiosity meets pure enjoyment for learners of all ages! Founded by a team of lifelong maths enthusiasts, we believe that numbers aren’t just for tests – they’re for exploration, discovery, and delight. Whether you’re eight or eighty, a beginner or a seasoned problem solver, you’ll find a growing collection of logic based games and puzzles that cover every corner of mathematics.
















One Response
You were on the right track with the rates! A works at 1/5 job per hour and B at 1/8, so together they do 1/5 + 1/8 = 13/40 of the job per hour. In 2 hours, that’s 2 × 13/40 = 26/40 = 13/20 of the job done. So what’s left is 1 − 13/20 = 7/20. Now, here’s the key bit: don’t subtract 2 from B’s 8 hours-that 8 hours was for the whole job alone, and we only need the time for the remaining chunk. Instead, take the remaining work and divide by B’s rate: time = (7/20) ÷ (1/8) = (7/20) × 8 = 56/20 = 14/5 hours, which is 2 hours 48 minutes. Add back the first 2 hours they worked together, and the total time is 2 + 14/5 = 24/5 hours, i.e., 4 hours 48 minutes. Little moral of the story: always divide the leftover fraction by the worker’s rate, not by their total solo time.