I’m working on a work-rate problem and I *think* I’ve set it up correctly, but I don’t fully trust my reasoning yet. The problem says something like: Alex can paint a fence in 6 hours, and Jamie can paint the same fence in 10 hours. If Alex starts painting alone for 2 hours, then Jamie joins in, how long will it take them to finish the fence together?
My attempt is that Alex’s rate is 1/6 of the fence per hour, and Jamie’s rate is 1/10 of the fence per hour. So after 2 hours, Alex has painted 2/6 = 1/3 of the fence, meaning there should be 2/3 left. Then once they work together, their combined rate should be 1/6 + 1/10 per hour.
That all feels logical, and I’m weirdly excited by how the fractions represent “chunks of fence per hour” rather than just random numbers. But I keep getting nervous about whether I’m mixing up “time spent” and “amount of work done,” especially when someone starts later. Am I thinking about the setup the right way, or is there a hidden trap in this kind of work-rate problem? Any help appreciated!
















3 Responses
I think you’ve set it up the right way. Let me walk through it slowly, because I sometimes get tripped up by “rates vs. times” too, and I want to sanity‑check each step.
First, a tiny wrong turn I almost took: I initially caught myself thinking, “When they work together, maybe we average their times somehow-like something around the average of 6 and 10 hours?” But that mixes up time and rate. Time doesn’t add (or average) in these problems; rates do. A quick unit check helps: 1/6 fence per hour and 1/10 fence per hour both have the same units (fence/hour), so those are the quantities we’re allowed to add.
Here’s the step-by-step:
1) Individual rates
– Alex: 1/6 fence per hour.
– Jamie: 1/10 fence per hour.
2) What Alex gets done alone in the first 2 hours
– Work done = rate × time = (1/6) × 2 = 2/6 = 1/3 of the fence.
– So 2/3 of the fence remains.
3) Combined rate once Jamie joins
– Combined rate = 1/6 + 1/10 = 5/30 + 3/30 = 8/30 = 4/15 fence per hour.
4) Time to finish the remaining 2/3 at that combined rate
– Time = (remaining work) / (combined rate) = (2/3) ÷ (4/15) = (2/3) × (15/4) = 30/12 = 2.5 hours.
5) Total time from Alex’s start
– 2 hours (Alex alone) + 2.5 hours (together) = 4.5 hours total.
Let me double-check by splitting the work contributions, just to be sure I didn’t gloss over anything:
– Alex’s total contribution:
– First 2 hours: 1/3 of the fence.
– Then 2.5 hours at 1/6 per hour = 2.5/6 = 5/12.
– Combined: 1/3 + 5/12 = 4/12 + 5/12 = 9/12 = 3/4.
– Jamie’s contribution:
– 2.5 hours at 1/10 per hour = 2.5/10 = 1/4.
– Total work: 3/4 + 1/4 = 1 fence. Checks out.
Where’s the common trap?
– The main trap is adding times or thinking in terms of “how long each would take” instead of “how much of the job per hour each does.” Time is like distance divided by speed; if two people “add their speeds,” you should be adding their rates (fence/hour), not their times (hours).
– Another small pitfall is forgetting that someone starts later. The fix is exactly what you did: break the timeline into phases and compute the work done in each phase using the appropriate rate(s).
Optional alternate viewpoint (sometimes feels cleaner): Pretend the fence has 30 “units” (the least common multiple of 6 and 10).
– Alex paints 5 units/hour, Jamie paints 3 units/hour.
– In 2 hours, Alex paints 10 units. Remaining: 20 units.
– Together they do 8 units/hour, so finishing takes 20/8 = 2.5 hours.
– Total time is again 4.5 hours.
Reference if you’d like to see more examples: Purplemath’s page on work problems explains the “add rates, not times” idea nicely:
https://www.purplemath.com/modules/workprob.htm
Khan Academy also has a short set on work word problems:
https://www.khanacademy.org/math/algebra/x2f8bb11595b61c86:work-word-problems
Follow-up question: If Alex instead worked alone for 3 hours before Jamie joined, how long would the total time be then? And if you’re up for a twist: what changes if Jamie paints only 80% as fast as usual after the first hour of working together?
You’ve set it up perfectly: Alex paints 1/3 in 2 hours, leaving 2/3; together they go at 1/6 + 1/10 = 4/15 fence per hour, so finishing takes (2/3)/(4/15) = 2.5 hours after Jamie joins (4.5 hours total from Alex’s start).
Analogy time: it’s like filling a tub-Alex’s tap runs first, then Jamie opens a second tap, and it’s the water level (work done) that adds, not the minutes themselves.
Your setup is exactly right. Think in terms of “work done” = rate × time. Alex’s rate is 1/6 fence per hour, Jamie’s is 1/10. After 2 hours alone, Alex completes 2 × (1/6) = 1/3 of the fence, leaving 2/3. When they work together, rates add because they’re contributing to the same pool of completed work: 1/6 + 1/10 = 4/15 fence per hour. The time to finish is remaining work divided by combined rate: (2/3) ÷ (4/15) = (2/3) × (15/4) = 5/2 = 2.5 hours. So the total time from Alex’s start is 2 + 2.5 = 4.5 hours.
A common trap is to mix up adding times with adding rates. Times don’t add when working simultaneously; rates do. A couple of quick checks can build confidence: if both had started together, they’d finish in 1 ÷ (4/15) = 15/4 = 3.75 hours. Since Jamie started late, the total should be longer than 3.75 hours; and it should still be less than Alex working alone for 6 hours. Your 4.5 hours fits neatly between those bounds, so the reasoning holds.
As a follow-up, how would you set it up if Jamie arrived after t hours instead of 2? Can you write a formula for the total time in terms of t?